Mingo Junction Water Line Replacement
The project consisted of the installation of nearly 2000 linear feet of sanitary sewer line ranging from 8 to 18 inches in diameter. The project also included the installation of 2000 linear feet of 8 inch diameter water line. All of these lines were located in existing roadways.
CTL Engineering provided construction testing and observation services as well as construction administration services.